Saltar al contenido
DUBAI POOL PROS

Renewing a tired plant room

Estas imágenes son ilustraciones generadas con IA de un trabajo habitual. No muestran un proyecto real de un cliente y no se atribuyen a ninguna empresa.

Después: Renewing a tired plant room
Antes: Renewing a tired plant room
AntesDespués
Tipo de piscina
Concrete with plaster finish
Problema original
A noisy pump, a filter that needed backwashing every few days and a chiller that could not keep up in August.
Alcance habitual del trabajo
Typical scope: measure flow and pipe sizes, replace the pump with a correctly sized variable speed unit, replace filter media, service or replace the chiller, tidy and label the pipework, add a control panel with timers.
Materiales y sistemas
Variable speed pump, glass filter media, pool chiller, control panel
Emirato
Abu Dabi